Electrical Work and Engine Rebuild
This past week has had a lot of activity on the Jeep with more small projects as I wait for good non-windy weather to paint the frame. Lots of electrical items have arrived for the Jeep, and I was able to test most of them with the battery. Some fun surprises! Work is about done on the engine with the oil pan reinstalled, just needs to be put back on the frame once the frame is painted.